Talara Refinery Modernisation
KAEFER’s international approach to the Talara project delivered significant productivity improvements in PFP, thermal insulation and scaffolding. The commitment shown...
Welcome to the KAEFER Group
KAEFER’s international approach to the Talara project delivered significant productivity improvements in PFP, thermal insulation and scaffolding. The commitment shown...
MSD is a member of Merck Group and a producer of animal health care products. KAEFER executed the full range...
The Haradh & Hawiyah Field Gas Compression Project is located in the south of Saudi Arabia’s Ghawar oil and gas...
KAEFER in Kuwait is executing passive fire protection for the steel structures at the top of eight LNG storage tanks...
The Bahrain LNG import terminal comprises a floating storage unit, an offshore LNG receiving jetty and breakwater, an adjacent regasification...
KAEFER in Indonesia is carrying out passive fire protection and refractory material installation in West Papua. Tangguh LNG is a...
Passive Fire Protection – Fendolite (33.5 mm): 14,203 m² Passive Fire Protection – intumescent (12.2 mm): 1,993 m² Structural Painting...
Hot Insulation – Piping (MW + GRP): 13,857 m² Intumescent Coating – H120 Pool fire-Pitt Char XP: 5,850 m² Tower...
The team implemented office and sanitary partition walls, absorber walls, expanded metal ceilings, curtain rails, fall-proof glass elements and numerous...