15.10.2024
Fujairah F3 CCGT Plant
Supply and application of insulation, painting & scaffolding works for F3 IPP project, Fujairah.
Welcome to the KAEFER Group
Supply and application of insulation, painting & scaffolding works for F3 IPP project, Fujairah.
The Crude Flexibility Project is an ongoing mega project in the United Arab Emirates. KAEFER’s activities are located in two...
Green Field: Piping Hot (MW + Aluminum): 25,555 m² Piping Hot (MW + Aluminised Steel): 6,403 m² Brown Field: Piping...
Passive Fire Protection – Fendolite (33.5 mm): 14,203 m² Passive Fire Protection – intumescent (12.2 mm): 1,993 m² Structural Painting...
Hot Insulation – Piping (MW + GRP): 13,857 m² Intumescent Coating – H120 Pool fire-Pitt Char XP: 5,850 m² Tower...