Kwinana Waste-to-Energy Power Plant
Provision of labour for mechanical erection of two boilers and associated works. *total hours for 2020
Welcome to the KAEFER Group
Provision of labour for mechanical erection of two boilers and associated works. *total hours for 2020
KAEFER designed specialist access and climate controlled containment systems with our Scaffolding, Access and Rescue teams, which is also crucial...
Tutuka is the Zulu word for progress. Since its completion in 1996, the Tutuka power station is feeding energy into...
Hinkley Point C is the first of a new generation of UK nuclear power stations and is the largest construction...
EDF’s Gravelines power station is located on the North Sea coast, at an equal distance from Dunkirk and Calais. It...
The Żerań power plant is one of the largest cogeneration plants in Poland. Located in Warsaw, it is the second...
The new combined heat and power plant in Vilnius will be able to produce about 40% of the heat centrally...
Right before summer holidays in 2020, client Borealis got hit by a big fire on one of its sites. Luckily,...
KAEFER in Malaysia has been performing insulation, refractory and scaffolding works for the Melaka refinery for our client Hyundai. The...
The team of KAEFER in Australia has been providing various structural, mechanical, piping, electrical and instrumentation upgrades in the Hydromet...
Provision of labour for mechanical erection of two boilers and associated works. *total hours for 2020
2 biofuel boiler system. Technical insulation (boiler, equipment, piping, ducts) and scaffolding. Insulated surfaces in total of approx. 26,300 m²....