15.10.2024
Cruas Remplacement P1000S TR2
In Cruas power plant, the French teams have done the replacement of the lagging in all areas of the reactor...
Welcome to the KAEFER Group
In Cruas power plant, the French teams have done the replacement of the lagging in all areas of the reactor...
KAEFER designed specialist access and climate controlled containment systems with our Scaffolding, Access and Rescue teams, which is also crucial...
Hinkley Point C is the first of a new generation of UK nuclear power stations and is the largest construction...
EDF’s Gravelines power station is located on the North Sea coast, at an equal distance from Dunkirk and Calais. It...