Cruas Remplacement P1000S TR2
France, Energy NuclearAbout This Project
In Cruas power plant, the French teams have done the replacement of the lagging in all areas of the reactor building, with the exception of the vessel shaft and the RIC area and what was semi-encapsulated. All the lines have had the protect 1000S insulation replaced with fluff wool in the form of an insulating blanket.

Owner
EDF SA
Client
EDF SA
Executing Company
KAEFER SAS
Time frame
2023 - 2024