Welcome to the KAEFER Group
Green Field: Piping Hot (MW + Aluminum): 25,555 m²
Piping Hot (MW + Aluminised Steel): 6,403 m²
Brown Field: Piping Hot (MW + Aluminum): 107,448 m²
Piping Hot (MW + Aluminised steel): 27,032 m²
Inspection windows (Nos): 3,448
Suspended type Scaffolding: 27,092 m²
Tower type Scaffolding: 20,062 m³
*total hours until 2020
ADNOC Onshore
Samsung Engineering
KAEFER LLC
Insulation, Scaffolding
928,410*
2020 - 2022