Welcome to the KAEFER Group
A success story that’s over 100 years in the making. An international team with over 30,000 employees. And a future that we can create together – Carl Kaefer couldn’t have imagined any of this in his wildest dreams. Today, we look back not just on a fascinating history, but also towards an exciting future full of innovation, ideas and engaged people. Because they are the ones that make KAEFER into something special.
The idea of using peat for insulation inspired Carl Kaefer 1918 to found our company.
TYPICALLY
Workers cutting peat, postcard 1911.
January 1920: entry of ‘Ingenieurbüro Carl Kaefer & Co.’ into the commercial register in Bremen. Heinrich Carl Lambert Kaefer and Robert Berman are managing partners.
Official entry in the commercial register, 1920.
First major contracts for insulation work on ships. Five insulation fitters are hired, and the first truck is purchased.
KAEFER grows and employs 15 skilled workers in 1923.
At times there are around 300 KAEFER fitters working at the Blohm & Voss shipyard in 1926 and construct the “Europa” for the northern German Lloyd as well as the “Bremen” for AG Weser – both the most modern turbine passenger ships in the world.
The proud team in front of KAEFER’s first truck.
TYPICALLY
The first branch in Wesermünde-Geestemünde is entered into the commercial register in Hamburg 1928.
The effects of the economic crisis don’t pass the young Carl Kaefer & Co. company by. The branch in Wesermünde is closed again in March 1930.
TYPICALLY
As remembered by Robert Renken.
Robert Berman leaves the company in 1933 because of his Jewish heritage. Berman and Kaefer delay the sale of his share of the business until 1936. Robert Berman retains a consulting role at the company.
TYPICALLY
Carl Kaefer with other Bremen merchants.
The first apprentice begins his training 1935 at KAEFER. KAEFER employs 60 fitters on average.
In 1936, the company employs 70 people.
70 percent of total turnover in 1936 is in insulation, fitting and in stone and woodwork. 30 percent is made with the trade in insulation materials.
As part of his search for a successor, Carl Kaefer meets Heinz Peter Koch in 1938, who works as an executive assistant and technical merchant at Siemens in Berlin.
Employee insurance card, 1939.
Payroll book, 1938.
The beginning of the war 1939 sees an increase in defence spending in the Third Reich. KAEFER works on marine jobs and continues to develop insulation mats.
New branches are established in Emden, Oldenburg and Elberfeld in 1940 and workshops are set up in Swinemünde and Grevesmühle.
Carl Kaefer and Heinz Peter Koch enter into a partnership agreement on the 28th June 1941. The company is converted to a limited partnership.
1942 sees the establishment of a KAEFER provident fund to protect employees. Shares of the limited partners profits maintain the fund. Employees are not required to contribute.
‘Carl Kaefer & Co.’ works in aircraft construction at Weser-Flugzeugbau in 1944.
In 1944, 177 people work at ‘Carl Kaefer & Co.’ on average.
Carl Kaefer dies on the 11th April 1944 in Rotenburg/Hanover after a long illness. His widow Wilhelmine is his heiress.
The branches in Hamburg and Bremerhaven are being destroyed in 1945.
TYPICALLY
As remembered by Heike Ernst.
1945, towards the end of the war, only around 80 people work for the company as many were drafted into the military. Heinz Peter Koch was also drafted and is captured in the Netherlands. He is then released on the 19th of October. In the winter of 1945, approximately 15 employees restart work in a temporary office in Bremen.
TYPICALLY
As remembered by Edith Ader.
Material shortages dominate in the years after the war.
First trials with insulation cladding take place in 1948.
KAEFER celebrates its 30-year anniversary on 1st October 1948 in Bremen at the “Erwin Malorny” restaurant with Wilhelmine Kaefer and the company’s employees. This will later become the site of the insulation mat workshop for the Bremen branch.
TYPICALLY
As remembered by Erika Tiedemann.
Industrial insulation work in the 1940s.
First contract in the oil industry 1950: major cladding work is done at the new Mobil Oil refinery in Bremen Oslebshausen. These are prefabricated at the KAEFER workshop.
TYPICALLY
As remembered by Folkert Oldenburger.
Robert Berman’s son, Emil Berman’s compensation claims are settled on 25th September 1951.
In 1951, KAEFER brings a patented, weather-independent insulation system made from hard foam with seawater-resistant aluminium covers as an inner cladding to the market.
Employees of the mattress workshop in Bremen.
The German fishing and merchant fleet is built up in 1954. KAEFER offers insulation for refrigerated vessels. Further patents are filed.
In 1956, KAEFER moves to Pillauer Straße/Getreidestraße in Bremen, where the company is located to this day.
Blue and white-collar workers are competing in the “Soccer Championship” in 1955 (Heinz Peter Koch, 2nd from left in upper row).
TYPICALLY
KAEFER registers a patent for “metal cladding for pipe insulation” in 1957.
Polyurethane foam is processed as of 1959 at KAEFER and used as insulation.
Entrance branch office Bremen, 1961.
For the first time, KAEFER employs over 1,000 people in 1961.
Major contract at the Esso refinery in Cresier, Switzerland. In 1964, KAEFER benefits from international recognition and attention as a result of the seamless execution of the project.
TYPICALLY
As remembered by Arno Recknagel.
Heinz-Peter Koch dies aged 57 in 1965. His wife Annelotte takes over the running of the company with sons Hubert and Ralf in 1966.
Central administration and the branch office are divided from one another in Bremen 1967.
TYPICALLY
KAEFER celebrates its 50-year anniversary with a large party at Getreidestraße on 1st October 1968. The book “KAEFER Isoliertechnik– yesterday, today and tomorrow” is published.
KAEFER equips the swimming and sports hall at the Olympic stadium in Munich with a translucent ceiling in 1972.
TYPICALLY
As remembered by Ralf Koch.
First insulation of an LNG carrier 1973: KAEFER works on the “Venator” tanker for the Moss shipyard.
In 1974, KAEFER receives the largest acoustic contract to date. Worth over 10 million DM, the client is the University of Bielefeld.
What’s taken for granted today wasn’t in the 70s: the first female apprentice starts at KAEFER Germany in 1974.
TYPICALLY
As remembered by Carsten Wrede.
KAEFER installs thermal insulation in 1976 at the new UNO city superstructure in Vienna.
The first insulation of a liquefied petroleum gas (LPG) tanker: shipbuilders Wärtsilä in Turku, Finland contract KAEFER in 1976 to insulate seven LPG ships.
KAEFER engineers develop the basis for cryogenic insulation systems in 1978.
KAEFER finds a home in the offshore sector as well, outfitting a Phillips Petroleum Company drilling rig in the Norwegian Ekofisk oil field in 1979.
In 1980, colleagues from Austria are responsible for engineering, material supply and the fitting of over 200,000 m² of thermal insulation for a refinery in Arzew, Algeria.
Noise emissions from train tracks are substantially reduced 1981 with KAEFER’s help in the expansion of Munich’s subway system: mats placed underneath gravel have excellent sound-absorbing qualities. KAEFER is responsible for preparation for fitting and the fitting itself.
KAEFER introduces computerised payroll accounting in 1981. One year later, the entire accounting department makes the switch
KAEFER is also active in two large scale projects in southern Germany 1982: the new construction of an ethyl plant at the German Marathon Petroleum refinery in Burghausen as well as the construction of the nuclear power plant at Grundmemmingen.
KAEFER takes part in the expansion of the natural gas liquefaction plant at Arun in Sumatra once again in 1982. KAEFER was already there at this large-scale construction project when the first phase was completed in 1978.
TYPICALLY
TYPICALLY
As remembered by Hartmut Kolkowski.
KAEFER celebrates 65 years in business on the 1st of October 1983.
In 1984, KAEFER is involved in the refitting of the ’German Research and Development Institute for Space and Aeronautics’ large-scale wind tunnel in Cologne. The tunnel is converted from subsonic to sub-zero temperature operation.
Video about the European Transonic Windtunnel project.
The first edition of “K-WERT”, the employee magazine, is published 1984.
TYPICALLY
One in five prospective industrial insulators in Germany do their apprenticeship at KAEFER in 1984.
Introduction of the first company suggestion scheme, which makes individual employees’ ideas available to all as of 1985.
TYPICALLY
As remembered by Hermann Klezath.
Large scale contract in Norway 1985: KAEFER is involved in insulation work for the new construction of a natural gas liquefaction plant in Kårstø. 350 KAEFER employees are working there at peak times.
The construction of passenger ships sets sail in 1986: insulation work is performed on the “Karl Carstens” (photo) and “Peter Pan” ferries.
The ‘operational safety’ department is founded in Germany in 1987.
KAEFER employees from Belgium prepare sheet metal and coordinate local personnel in Moso, Burundi in 1988, who fit the insulation for two boilers at a sugar factory.
KAEFER employees insulate several fermentation and storage tanks at a brewery in China over the course of 13 months in 1988.
The opening of the East German border 1989 allows KAEFER to expand its business into the new German states.
KAEFER manufactures and installs an interior cryogenic insulation system for the European Transonic Wind Tunnel (ETW) in 1992 – the world’s most modern testing facility for supersonic flight.
Queen Elizabeth II. is visiting the construction of the ETW.
TYPICALLY
As remembered by Arno Recknagel.
In 1992, KAEFER secures a contract for the insulation of the steel container at the German Neumayer II research station in Antarctica.
KAEFER celebrates its 75-year anniversary in 1993 with a ceremony at the upper city hall in Bremen and an exhibition.
Movie on the occasion of the 75th company anniversary.
Kvaerner Masa Yard contracts KAEFER in 1993 to insulate the spherical transport tanks and deck lines on four 135,000 cubic metres LNG tankers for the Abu Dhabi National Oil Company (ADNOC). The work is completed in 1997.
Article from WESER-KURIER 1993 on the occasion of KAEFER's 75th anniversary.
KAEFER sets up an advisory board in 1994, consisting of external as well as family members to advise management and all remaining shareholders.
In 1994, KAEFER is responsible for the complete cooling insulation of devices and pipes for the world’s largest steam cracker built in one unit in Antwerpen for BASF. 138 tonnes of PU in-situ foam and 66,000 m² of zinc-coated steel are processed.
Separation of capital and management – Annelotte and Ralf Koch withdraw from the daily management of the company and pass duties on to Norbert Schmelzle in 1995.
TYPICALLY
TYPICALLY
Norbert Schmelzle
KAEFER Isoliertechnik GmbH receives DIN EN ISO 900 certification 1996, followed one year later by SCC certification.
The German KAEFER Group website goes live in 1997.
KAEFER takes care of fire protection, heat and acoustic insulation and installs roofs and walls in the process of lengthening the “Norwegian Wind” and “Norwegian Dream” cruise liners 1998 at the Lloyd shipyard in Bremerhaven, Germany.
KAEFER plans, manufactures and delivers cassette insulation for the primary cooling circuit at the Brazilian ‘Angra II’ nuclear power plant in 1997. KAEFER employees also supervised fitting on site.
TYPICALLY
As remembered by Henry Kohlstruck & Günther Ahlers.
KAEFER removes asbestos in pipes, interior walls and facades in 1998 during the renovation work at the “Centre National d’Art et de Culture Georges Pompidou” in Paris, France.
Since 1999 modern simulation software based on the finite element method is used to calculate complex insulation problems.
KAEFER is responsible not just for the insulation of residential modules on the IVANA drilling rig commissioned by INAGIP at the Viktor Lenac Shipyard in Rijeka, Croatia, but also delivers all of the interior outfitting in 1998.
Operational safety, the reduction of accidents and the quality of incident reporting is the focus of the ‘Safety Year 2000’ in Germany.
The biggest contract in KAEFER’s history to date in shipbuilding is realised: the building of the “Olympic Voyager” fast cruise liner starts and work on the “Olympic Explorer” begins as well.
Video KAEFER and Cruiseliner.
KAEFER registers a patent for new interior insulation of gas turbines. The new KAEFER construction uses a system of flat profiles and rails instead of heavy bolts. This is easier to fit and provides cost reductions of up to 20%.
Starting the production of flexible insulation mattresses for gas turbines. Manufactured in Abu Dhabi in a specially designed workshop.
Successful project completion on the world’s largest floating gas platform off the coast of Norway. KAEFER is responsible for the complete thermal insulation and fire protection of the “Åsgard B’s” platform and pipes, as well as the fire protection and interior outfitting of offices and residential quarters.
KAEFER becomes market leader in France through the takeover of WANNER SAS and WANNER Marine SAS from Vinci.
KAEFER is responsible for the fire protection elements in the ceiling of Hamburg’s Elbe Tunnel in Germany.
TYPICALLY
KAEFER showcases its abilities with two large-scale projects in Vienna. The redesign of the IBM House on the Danube canal and the expansion of the ARES Tower office building are impressive and attention-grabbing construction ventures.
The “Ulysses” ferry receives the ‘Cruise & Ferry Award 2001’ for features such as the observation deck, which was realised by KAEFER in Finland.
KAEFER undertakes insulation work on a Dow Chemical ethyl plant in the Netherlands and insulates a new block at an LNG facility in Borneo in Southeast Asia.
Introduction of the central apprenticeship system in Germany. All commercial apprentices are trained in Bremen.
To expand its position in the Eastern European market, KAEFER takes over the polish company TERMOIZOLACJA and its 600 employees.
INSTA-LAG® and TIPS® are specially prefabricated products for the insulation of pipes and heating boilers that can reach temperatures of up to 650 °C. These are introduced to the Australian market.
KAEFER receives a major contract from Shell and BP in South Africa: KAEFER is now responsible for maintenance, insulation, scaffolding and surface protection at the new SAPREF refinery for the next five years.
KAEFER Academy: the Junior Executive Academy (now called the Junior Leadership Programme) is established to identify, support and promote qualified talent.
KAEFER’s own ‘I\K\A\R\U\S’ calculation software is developed. This stands for insulation, calculation, handling, invoicing and SAP integration. It makes the efficient calculation of projects possible.
Third place at the European Championship for Industrial Insulators goes to a KAEFER employee.
KAEFER Abu Dhabi becomes the first company in the UAE to receive ISO 9001 and 14001 as well as OHSAS 18001 certification.
Award from the Karl Nix Foundation in Bremen: a KAEFER apprentice is given the Best Chamber of Trade Examinee prize.
World premiere in the Weser tunnel: a tunnel robot developed by KAEFER is used to fit passive fire protection for the first time during the construction of the Weser tunnel.
KAEFER know-how for China: during the building of two power plant blocks in Lianyungang, KAEFER provides its special knowledge to a Russian company under license and undertakes engineering work, construction and some parts of manufacturing itself.
KAEFER boards cruise liners in France: The “Queen Mary 2’s” 7 km-long cooling networks is insulated. On the “Crystal Serenity”, a total of 6 km of pipes and 2,500 m² of ventilation shafts are insulated in accordance with the strictest fire protection requirements.
KAEFER Finland is responsible for the development of turnkey solutions for Kværner Masa shipbuilders’ “Mariner of the Seas”.
KAEFER insulates pipes and channels in Lisbon’s European Cup football stadium.
KAEFER installs KAEMOBIL partition systems made of metal in BMW’s production facility in Leipzig, Germany. Mounting the 30-metre-long, self-supporting F30 cabins was particularly challenging.
TYPICALLY
Start of the ‘Snøhvit’ project, the largest single contract in the company’s history till then: in cooperation with Aker Kværner, KAEFER develops an integrated service package for the construction of an LNG plant in Norway for Statoil.
First successful major contract in Vietnam: KAEFER works with up to 500 fitters on the new construction of a fertiliser factory in Southern Vietnam and is responsible for insulation and scaffolding works.
KAEFER develops the ‘twin bed’. It is made up of a lying surface that is rotatable along the longitudinal axis of the bed. And there is a mattress and bedding on each side, which makes it easy to simply turn over when shifts change.
TYPICALLY
KAEFER sets up a new metal workshop in Scheeßel, near Bremen, which brings several workshops together in one place. This concentrates production capacity for the northern German region in one workshop.
A record at KAEFER South Africa: 3 million working hours without a single ‘lost-time injury’ (LTI) at the SAPREF construction site.
KAEFER receives the ‘Apprenticeship Ace’ award as Germany’s best company for apprenticeships from Federal Education Secretary Edelgard Bulmahn.
KAEFER takes over the refurbishment and expansion of the old ‘Hafenspeicher XI’ building in Bremen, Germany as well as further extension parts of the Weser Stadium.
In March, the company-own Sizani scaffolding training centre opens in South Africa. It is available to KAEFER employees as well as external scaffolders.
KAEFER insulates around 35 km of piping and 2,000 m² of facility space at the Neste oil refinery in Kulloo, Finland with the help of Estonian and Polish colleagues.
The ice breaking universal research vessel “Maria S. Merian” is christened. KAEFER is responsible for the insulation of the engines and the complete interior outfitting of the living and working areas through to the wooden decks and kitchen.
Major project in the Middle East: KAEFER undertakes extensive heat, cold and sound insulation as well as scaffolding work at the Dolphin gas project in Qatar commissioned by engineering firm JGC Corporation of Japan.
60 KAEFER fitters perform extensive insulation work over the course of 18 months at the Allianz Arena in Munich, Germany.
Award from the Karl Nix Foundation in Bremen: a KAEFER apprentice is given the Best Chamber of Trade Examinee prize.
KAEFER acquires Parker in Canada and enters one of the fastest growing markets for insulation and offshore. PARKER KAEFER is market leader in industrial insulation in the region and offers insulation, surface protections and scaffolding services.
Heat technology calculation with KAEFER’s own WTB programme. KAEFER is one of the few companies in the world that also continuously takes part in the maintenance and further development of the complex WTB programme.
Large scale project in Munich, Germany: KAEFER handles the challenging interior outfitting of the auditorium at BMW Welt, with the highest demands in design and acoustics.
Australia: first use of rope access for the “Alcan Gove” maintenance project.
A KAEFER apprentice is awarded Best Insulation Fitter in Germany by the DIHK.
After 14 years, KAEFER is involved with the Alfred Wegener Institute in Antarctica again: interior outfitting, heating and cooling as well as water supply, sewage and plumbing is taken care of by KAEFER at the ‘Neumayer III’ station.
TYPICALLY
KAEFER Spain receives a contract for the insulation of pipes and valves for the Adriatic Project, the world’s first offshore LNG terminal in the middle of the sea off the coast of Italy.
Acquisition of G+H Schiffausbau GmbH to expand expertise in furniture manufacturing, decorative interior outfitting and gas tank insulation.
Majority stockholding in the British insulation specialist C&D, a leading company on the British market for industrial insulation.
As in the year before, the best insulation fitter is a member of the KAEFER Team (apprenticeship exam).
A high performance climatic chamber offers new possibilities: KAEFER invests in a 15 cubic metres climatic chamber that can reproduce temperatures between +120°C und -75°C, whilst being able to modify temperature, humidity and pressure at the same time.
Cold insulation of ADGAS is renewed on “Das Island” in the United Arab Emirates. In one of the most prestigious projects in its history in the Middle East, KAEFER in Abu Dhabi replaces the insulation of around 85,000 m² of piping and tanks, produces and fits 9,000 pipe supports.
KAEFER is on board for the interior outfitting of the largest cruise liners in the world. In Finland, France and the Bahamas with the “Liberty of the Seas”, “MSC Orchestra” and the “Majesty of the Seas”, to name just a few.
Image of the „Liberty of the Seas“.
KAEFER Norway receives a contract for the maintenance and conversion of the “Grane” and “Heimdal” offshore platforms. Part of the job includes insulation, paintwork and scaffolding.
The “KAEFER Aids Relief Programme” in South Africa is introduced.
At the Hamburg ‘Elbphilharmonie’ in Germany, KAEFER is fire proofing the steel beams under the striking trapezoidal roof: 6,000 m² of roof surface, 5,000 m² of supporting structure and 1,200 linear meters of flanged connections are covered. The fire protection of difficult connections and transitions are carried out in F 90 or F 120 ‒ an elegant composition in steel and mineral wool.
KAEFER Isoliertechnik GmbH receives BS OHSAS 18001 certification.
KAEFER supports the Bremen Chamber Orchestra as the main sponsor.
TYPICALLY
Peter Hoedemaker takes over as Chief Executive Officer from Norbert Schmelzle.
The pilot phase of KAEFER’s “PMQ” project management qualification for construction and project leaders begins.
KAEFER employee makes a great performance and comes out on top against 17 other competitors at the European Championship for young insulators.
As part of its 90-year anniversary, KAEFER renovates the UNESCO World Heritage upper city hall as a gift to the city of Bremen.
TYPICALLY
As remembered by Ralf Koch
The ‘Woodside Train 5’ LNG facility is finished after two years of construction work. KAEFER Australia takes care of extensive insulation work in the largest project in the company’s history with a volume of 30 million Euros.
KAEFER Australia opens a new prefabrication facility for pre-insulated components.
KAEFER wins the ‘Top Areva Supplier’ award from international energy company Areva.
The UN contracts KAEFER Australia to remove asbestos roofs from UNMit warehouses in Timor-Leste. At the same time, new roofs made of monoclad sheet metal are installed and insulated.
KAEFER Norway wins the contract for all insulation, painting, passive fire protection and scaffolding maintenance work on Statoil's Gjøa platform in the North Sea.
KAEFER is a proud founding member of the European Industrial Insulation Foundation (EiiF) together with 11 other leading companies.
The PPP-Project ‘MovIEE’ – ‘Moving India’s SMEs towards an energy efficient future’ starts as cooperation between KAEFER Punj Lloyd in India and the ’Deutsche Gesellschaft für Internationale Zusammenarbeit’ (GIZ).
KAEFER constructs the entire wellness and spa area, including the largest Finnish sauna at sea with room for 54 people on the “Mein Schiff”.
KAEFER in South Africa expands its ‘Sizani Technical Skills Training Centre’ by adding a metal processing school.
The Corporate Competence Center Mattresses is founded and bundles the know-how for mattress systems with the insulation of steam and gas turbines.
The “Advanced Management Programme” begins for the first time as part of the KAEFER Academy.
The start of the Green Car Policy in Germany: in addition to financial considerations, emissions and consumption become criteria for company car choices.
Annelotte Koch, former Managing Director and shareholder, dies in March aged 93.
The first major project for KAEFER in New Caledonia: KAEFER provides scaffolding for a nickel mine.
The earthquake in Chile in February affects several employees and their families. Colleagues from around the world help to rebuild lives with their donations.
Premiere of the “International KAEFER photo competition”. Employees around the world submit photos about ‘cultural diversity’. The winning entries feature in the KAEFER annual calendar.
The European Championship title and the German Master of Industrial Insulator Technicians title go to a KAEFER employee.
A KAEFER apprentice is awarded Best Insulation Fitter in Germany by the DIHK.
The company headquarters moves to the heart of Bremen on Marktstraße.
The ‘UK Design Scaffold Team‘ is founded. KAEFER in the UK is expanding its portfolio with this independent scaffolding service.
KAEFER presents itself to around a million visitors at the communal Bremen stand and the EXPO 2010 in Shanghai. Focussing on ‘Energy Efficiency’, the company shows the benefits of insulation when it comes to environmental protection.
Founding of the KAEFER Foundation gGmbH to support KAEFER employees in the case of emergencies and natural disasters.
KAEFER in Qatar takes over the corrosion protection for the Dolphin Energy’s ‘DOL 1‘ and ‘DOL 2‘ platforms.
The “KAEFER Code of Business Conduct” is introduced worldwide as a binding code of practice at the KAEFER Group.
KAEFER Abu Dhabi receives a contract for the construction of a four-storey hanging scaffold at an 11 km piping bridge as part of the ‘Shah Gas development project’.
Indian research station Bharati, Antarctica: building upon blueprints, KAEFER is responsible for structural engineering, construction, facades and the complete outfitting of the station, including living and working containers as well as the outfitting of the partially prefabricated station at the South Pole.
TYPICALLY
KAEFER Isoliertechnik GmbH receives DIN ISO 14001 certification.
All aboard on the “Alexander von Humboldt II” and “Rainbow Warrior III” sailing ships. KAEFER is responsible for the delivery and installation of the ship’s kitchen on the 65-metre-long three-mast vessel. Just like on Greenpeace’s “Rainbow Warrior III” – equipped with a galley specially constructed by KAEFER.
Year of action for “Occupational Health and Safety 2012” – the first worldwide campaign launched throughout the company in 13 languages. The five main themes are: risk assessment, training, health, work at height and manual handling.
KAEFER wins the annual ‘Partner of the Year’ award from Meyer Yard for the high quality of its interior outfitting.
A successful, international drawing competition for the children of employees takes place – the theme is “Health and safety at your parents’ workplace”.
KAEFER Spain completes a two-year expansion project at Europe’s largest refinery at Repsol in Cartagena: two ten-hour shifts per day, 350 workers, 800,000 hours worked.
The Indian Bharati research station is completed on schedule by KAEFER Construction Germany. After 5 months of work, this station is handed over during the Antarctic summer. It is the third polar station that KAEFER has worked on.
The first KAEFER Group sustainability report is published.
This video shows cruise & ferry references from KAEFER Shipbuilding.
The second “International KAEFER photo competition” takes place where the theme is “KAEFER in colour”: 23 countries, 631 fantastic photos and 19 winners.
Fogadtatás! KAEFER opens a new facility in Hungary. The new facility for turbine insulation and mattresses for products such as manifolds, flanges and valves secures KAEFER’s leading position in the mattress insulation market.
TYPICALLY
First worldwide employee survey at KAEFER with a participation rate of 70%.
KAEFER acquires know-how in passive fire protection through the takeover of Prostar Marine Services in Singapore.
The KAEFER Lean Journey begins with a pilot project on the “Åsgard B” platform in April, which is maintained by KAEFER.
KAEFER Finland receives several contracts for the renovation of different cruise ships: “Pride of America”, “Legend of the Sea”, “Carnival Sunshine”, “Disney Magic” and “MS Bergensfjord”.
Inspection, maintenance and cleaning work at Dow Chemical Ibérica in Tarragona. KAEFER in Spain provides a major contribution to the project with the build-up and removal of scaffolding, corrosion protection and insulation work. Reaching a height of 116 metres, this is the highest scaffolding tower ever built at a factory in Europe.
The first ‘KAEFER Trophy’ takes place in Bremen’s Sportgarten, Germany. It combines a football tournament with the presentation of apprenticeship opportunities at KAEFER.
Start of an anniversary project: the 25th tunnel in 10 years. KAEFER is responsible for the planning and installation of the fire protection for the E6 road tunnel in Trondheim in Norway.
KAEFER demonstrates its competence at one of Europe’s most ambitious construction projects: KAEFER is responsible for the planning, manufacture and integration of the fire protection of the tower connections at the new headquarters of the European Central Bank in Frankfurt, Germany.
TYPICALLY
At the Sellafield Ltd Supplier Forum 2014 KAEFER United Kingdom wins the ‘Going the extra mile’ award in the additional services category.
The PACT day, launched throughout the company, officially marks the end of the ‘Year of Quality 2013/2014’. The four focus themes are Planning, Administration, Communication and Technical quality.
Cooperation for the import terminal for LNG in Swinemünde on the Baltic coast. KAEFER employees from Poland and Spain work with colleagues from the Corporate Competence Centre LNG (CCCL) in Germany. Colleagues from the pre-insulation workshop in Australia also help out.
The third “International KAEFER photo competition” takes place. The theme is “from another viewpoint”. Numerous employees from around the world take part: 478 photos, 197 participants, 25 countries, and 20 winners.
Cooperation between KAEFER Energy in Norway and KAEFER Engineering in Thailand for a module for Statoil‘s “Troll A” platform.
KAEFER is responsible for the surface treatment of 57 foundation gravity modules and prefabricated steel modules at the Gorgon gas project, one of the largest gas projects in the world.
TYPICALLY
The Neptun Yard in Rostock-Warnemünde, Germany awards KAEFER as its ‘Partner of the Year 2014’.
KAEFER Industrie GmbH in Germany receives an award in the ‘Safety for Contractors’ category at the ‘Bayer Supplier Day’.
KAEFER Brazil becomes market leader in industrial services and substantial increases market share in South America with the acquisition of RIP Serviços Industriais.
Lean Journey: KAEFER creates an environment of continuous improvement, increased efficiency, the establishment of a ‘lean leader’ network and training all around the world with more than 40 projects where lean principles are implemented in 2014.
KAEFER Construction GmbH receives a contract for the interior outfitting of the new Audi motor sport centre in Neuburg, Germany.
KAEFER takes part in an initiative of Bremen’s chamber of commerce to help young refugees gain better access to education.
50 years of Corporate Technology and Research (now Corporate Innovation & Technical Excellence).
KAEFER celebrates 80 years of apprenticeships: the first apprentices started in 1985 at the family company in Bremen. Throughout this period, 1,352 young people took up an apprenticeship at KAEFER.
TYPICALLY
As remembered by Arno Recknagel & Karl-Rudolf Friese
RIP Brazil secures a further contract with PETROBRAS for the heat insulation at the platforms for Santos Basin, Sergipe und Alagoas.
The tragic earthquake affects over 200 of 1,000 Nepalese KAEFER employees in the Middle East in April. Regional management immediately reacts by establishing an emergency committee to help Nepalese employees to contact families, take time off from work or help directly on the ground. Other members of the KAEFER Team help as well.
Within just two weeks in the dry dock, KAEFER Finland manages to renovate selected areas of the “M/S Finlandia”. The demolition and preparatory work is done during normal operation shortly beforehand.
KAEFER Kuwait receives a contract for scaffolding work at the ‘Clean Fuel Project’ at the Mina Al Ahmadi refinery from South Korea’s SK E&C.
RIP Brazil receives an important contract from the insulation of Presidente Vargas Steelworks, which is run by Companhia Siderúrgica Nacional (CSN).
KAEFER Qatar receives a contract for fire protection measures at the Laffan refinery from the Consolidated Contractors Company, the largest construction company in the near east.
KAEFER launches its new image film.
The Bahwan Engineering Group awards KAEFER Oman a major contract for large-scale pipeline Insulation work at the Duqm refinery.
KAEFER Poland is awarded as an "Young Worker-Friendly Employer".
KAEFER acquires Wood's Industrial Services Business UK and Ireland.
KAEFER Sweden is awarded a diploma from Preem for the safety work during the turnaround at Preemraff Lysekil 2019.
KAEFER Energy receives a new maintenance contract by Equinor. The agreement represents several billions in sales for KAEFER Energy during the term up to 2031 and will engage up to 500 employees.
The first digital version of the Sustainability Report is published.
The new KAEFER FOUNDATION website is launched. Designed with a fresh look in line with the updated design of the foundation, it provides an overview on the mission and fields of activity.
KAEFER and VDI celebrate 50th anniversary of funding membership. The VDI - Verein Deutscher Ingenieure e.V. (Association of German Engineers) provides important impulses for new technologies and technical solutions. With around 145,000 members, it is the largest technical and scientific association in Germany.
KAEFER Belgium wins BASF Antwerpen Safety Award 2019.
KAEFER UK & Ireland secures £90 million Industrial Services Framework contract renewal with Sellafield Ltd. The awarded framework extends the long-term relationship and will deliver a range of Industrial Services in Cumbria, including access, insulation and asbestos services.
KAEFER Industrie GmbH in Leipzig receives a framework contract from TOTAL Raffinerie Mitteldeutschland GmbH with a volume of € 10 million.
KAEFER Qatar gets recognised as "Best Contractor of the Year 2020" by the long-standing client Dolphin Energy.
KAEFER Construction in Berlin receives Rigips Trophy for the best performance in the category "Acoustic Systems".
KAEFER launches a global poster campaign on alcohol and drug abuse.
KAEFER Sweden received a major maintenance contract for insulation and scaffolding works from Borealis, a leading international provider of polyolefins, base chemicals, and fertilizers.
KAEFER UK & Ireland is awarded the SC21 Gold, given for Lean manufacturing and efficiency in the Aerospace and Defence Market.
On 20th September 2020, hundreds of KAEFER employees around the world join the so-called "Venuslauf" to raise funds in the fight against cancer. On their own, but close together, fantastic 11,971 km were covered by running, walking and cycling!
KAEFERs Co-CEOs Dr. Roland Gärber & Steen E. Hansen sign CEO-letter to European Commission to support the request to raise the EU 2030 emissions reduction target, the European Green Deal and a more climate-resilient and regenerative recovery of EU in response to the impacts of the Covid-19 pandemic.
Let's go digital! For the first time the yearly published magazin K-WERT is purely digital.
KAEFER Benelux receives the EH&S Contractor Award from the client DOW Benelux B.V..
KAEFER UK & Ireland strengthens partnership with Wood by entering into a three-year agreement to deliver industrial support services at Equinor's Mariner field. The agreement will run for three years.
KAEFER Engineering Ltd. Thailand achieves certification of Green Industry.
KAEFER UK & Ireland wins significant contract for major ductwork fabrication works for the new nuclear power station Hinkley Point "C" in South West England.
The KAEFER FOUNDATION supports three charitable organisations on the occasion of the World Environment Day.
KAEFER S.A. (Poland) wins Layher competition award.
The 10th edition of KAEFER's Sustainability Report is published.
The KAEFER values get a new look to further support the way of communicating the focus on strong values and continuity across all entities, countries and regions and to embrace the diversity of those we work with.
KAEFER Belgium secures important framework agreement for all Belgian nuclear power plants.
With the support of the KAEFER FOUNDATION KAEFER employees raise funds for the people affected by the flood disaster in Germany in mid-July 2021.
The sixth "KAEFER International Photo Competition" takes place. Numerous great entries from all around the world on the topic of diversity are submitted.
And we did it again! Between 17th and 19th September 2021, 1,500 KAEFER employees around the world joined the Venuslauf demonstrating the KAEFER team spirit and raising funds in the fight against cancer. Walking, running, biking, skating, surfing and canoeing - a total of 23,904 km covered.
KAEFER Malaysia receives a Certificate of Appreciation by our longstanding customer Toyo Engineering & Construction Sdn Bhd. for achieving 500,000 Manhours without LTI on the "Black Condensate & Heat Integration Project".
KAEFER Benelux reaches milestone of 3,000,000 hours worked without lost time due to injury (LTI).
A new edition of the K-WERT is published.
KAEFER announces a partnership with the Germany based SMS group (‘SMS’) and the European PE-fund Altor Fund V (‘Altor’) domiciled in Sweden, who, together, become a 50% shareholder in KAEFER. The new shareholders will partner with the current KAEFER shareholder family who will continue to hold the remaining 50% in KAEFER.
Five years after its launch, our global intranet "ONE" is getting an upgrade: "ONE.2" will be based on MS SharePoint Online, which offers many new possibilities and breaks down barriers.
KAEFER WANNER takes part in the Rope Access Championship 2022. Watch some impressive insights here!
KAEFER Integrated Services Pty Ltd has completed the acquisition of the assets of G&S Engineering from DRA Global. The acquisition strengthens KAEFER's capabilities throughout Australia as the G&S team brings experience in providing mechanical and electrical services in maintenance, turnarounds and project work.
KAEFER Poland celebrates its 75th anniversary.
The KAEFER Sustainability Report 2021 is published. The 11th edition describes the progress we have made in integrating environmental protection, social responsibility and good corporate governance (ESG) in our entire value chain.
KAEFER introduces the new Supplier Code of Conduct (SCoC) for KAEFER suppliers worldwide.
31,101 kilometres - that's how many kilometres KAEFER employees, their families and friends ran in the Venuslauf 2022 to raise money for cancer charities.
KAEFER launches "blu", an independent company with the mission to eliminate corrosion under insulation (CUI) using sensors and intelligent maintenance.
KAEFER UK & Ireland wins the HSE (Large) Award at the NASC (National Access & Scaffolding Confederation) Awards 2022.
RIP, KAEFER's Brazilian subsidiary, is awarded the "Recognition for Exemplary Occupational Safety" certificate at the 2022 International Contractor Championship by long-time client ThyssenKrupp.
As part of the KAEFER FOUNDATION's Christmas fundraising campaign, KAEFER companies around the world are collecting donations to support food banks for people in need.
The 40th and last issue of K-WERT is published. With a variety of topics, great graphics and interesting articles, a must for everyone who wants to know what's going on at KAEFER!
New management - KAEFER welcomes its new Executive Board Dr Roland Gärber (CEO), Sandro Barrach (COO), Karsten Wirth (CFO).
KAEFER's current Administrative Board.
KAEFER launches the new KAEFER Group Sustainability/ESG Policy. It contains 7 sustainability commitments and will help KAEFER to focus more on environmental protection, social responsibility and good governance (ESG). It applies to all members of the KAEFER Group.
Together with the apprentices of KAEFER Germany and their great idea to raise money by selling popcorn, the KAEFER FOUNDATION raised money for the victims of the devastating earthquakes in Turkey and Syria.
KAEFER Saudi Arabia has received a safety award from its long-standing client Saudi Aramco for its notable achievements and contribution to safety during the year.
KAEFER Integrated Services is awarded by Santos with two multidisciplinary contracts to provide a range of fabric maintenance services associated with the Darwin LNG Life Extension Project.
KAEFER Thailand has been awarded the Certificate of Achievement for "Excellence Safety Practice" by PTT Clobal Chemical Company Limited.
The German KAEFER Industrie Team, in cooperation with the KAEFER Team in Lithuania, successfully completes the "New Rastede Resin Factory" project.
KAEFER has been selected by Consolidated Contractors Company (CCC) as their insulation partner for the Qatar LNG NFE. The scope includes 1 million m² of insulation, of which 0.65 million m² is hot insulation and 0.35 million m² cryogenic insulation. This is one of the most important LNG projects in the world.
KAEFER has subjected its groupwide compliance program to an examination by an external auditor according to the Compliance Standard AsS 980 of the Institute of Public Auditors in Germany (IDW PS 980 n.F.) and with due consideration to ISO 19600 in relation to the areas of anti-corruption, antitrust and fraud. Thereby the implementation and appropriateness of the KAEFER’s Compliance Management System was confirmed according to AsS 980. You can see the details of the audit in the official assurance report.
The 7th International KAEFER Photo Competition took place from 22 March to 22 May under the motto #Together.
KAEFER Sweden was crowned champion at the 3rd annual Kewazo ScaffChamp 2023, held in Vilnius, Lithuania.
KAEFER's Lean Journey celebrates 10th anniversary.
KAEFER Brazil wins the SouLean category at Lean Summit 2023 in São Paulo, the world's largest Lean community summit.
KAEFER's UK & Ireland team at Kings Lynn Power Station has been awarded RWE's Mission Zero Award for its outstanding safety performance during the outage.
KAEFER's current financing is recognised as a 'Sustainability Linked Loan', marking a significant step forward in our commitment to ESG in terms of financial incentive.
KAEFER joins econsense - Forum for Sustainable Development of German Business e.V., a sustainability competence programme that brings together companies from different sectors on various ESG and sustainability related topics.
KAEFER Saudi Arabia has received a safety award from a long-standing client, South Korea-based Hyundai Engineering and Construction (E&C), for 1 million safe man-hours on the Marjan Increment Programme.
From Singapore to Aberdeen + From Gastech to Offshore Europe... you can count on KAEFER to be part of the conversations that matter. The teams from KAEFER Australia & APAC, KAEFER UK & Ireland and Blu exhibited simultaneously at Gastech in Singapore and Offshore Europe in Aberdeen.
Introducing the K-WERT stories. Instead of receiving a K-WERT at the end of the year, you can now read exciting short articles about KAEFER in digital form every two weeks.
Welcome to TestTorque Engineering in Brazil, part of the KAEFER Group. From now on they will be operating as KAEFER TestTorque Engineering.
Together for a good cause! More than 3,100 people took part in the Venuslauf 2023, covering 34,425.54 kilometres. What a great achievement!
KAEFER rocks the 2023 FESI European Insulation Championships. Niklas von Tungeln from KAEFER Industrie GmbH took first place, followed by Maciej Szatko & Tomasz Pawłowicz from KAEFER Polska. And that's not all - there were other KAEFER participants who did very well in the competition: François Sgard from KAEFER WANNER, Joachim Smistad Fjeldberg from KAEFER Energy AS and Kenan Tiro from KAEFER Industrie.
KAEFER Oman received a safety award from Vale in recognition of its unwavering commitment to workplace safety.
KAEFER Singapore has received the "Best Craft Award" from its long-standing client TECNICAS REUNIDAS.
KAEFER APAC is organising "R U OK DAY" to help promote mental health.
KAEFER Belgium has been awarded the 2022 Contractor Safety Excellence Award by Chevron Phillips Chemical (CPChem) in the Projects category.
The KAEFER FOUNDATION organised its annual Christmas fundraising campaign, collecting donations and backpacks to support local charities and their work.
Estás viendo un contenido de marcador de posición de Brevo. Para acceder al contenido real, haz clic en el siguiente botón. Ten en cuenta que al hacerlo compartirás datos con terceros proveedores.
Más informaciónEstás viendo un contenido de marcador de posición de Facebook. Para acceder al contenido real, haz clic en el siguiente botón. Ten en cuenta que al hacerlo compartirás datos con terceros proveedores.
Más informaciónEstás viendo un contenido de marcador de posición de Instagram. Para acceder al contenido real, haz clic en el siguiente botón. Ten en cuenta que al hacerlo compartirás datos con terceros proveedores.
Más informaciónEstás viendo un contenido de marcador de posición de X. Para acceder al contenido real, haz clic en el siguiente botón. Ten en cuenta que al hacerlo compartirás datos con terceros proveedores.
Más información