22.08.2024 A16 Tunnel, Rotterdam, Netherlands 110,800 m² of single- and double-layer laying of fire protection panels.
03.02.2023 Zeeland Refinery Turnaround 2020 The large, plant-wide turnaround was executed despite of the pandemic. This caused for an adjusted execution in terms of Health...