ArcelorMittal steel plant

Executing Company:
KAEFER S.A.
Client:
Mostostal Zabre
Location:
Dąbrowa Górnicza, Poland
Time frame:
2024 - 2025

KAEFER Poland is carrying out large-scale insulation and scaffolding works for Mostostal Zabrze in collaboration with E.ON

  • Supporting the installation of a flue gas heat recovery system at ArcelorMittal’s steelworks in Dąbrowa Górnicza
  • Insulating over 8,000 m² of ducts and heat exchangers using 30,000 m³ of scaffolding in a live production environment
  • Generating 117 GWh per year by capturing waste heat from the blast furnace