KAEFER Poland is carrying out large-scale insulation and scaffolding works for Mostostal Zabrze in collaboration with E.ON
- Supporting the installation of a flue gas heat recovery system at ArcelorMittal’s steelworks in Dąbrowa Górnicza
- Insulating over 8,000 m² of ducts and heat exchangers using 30,000 m³ of scaffolding in a live production environment
- Generating 117 GWh per year by capturing waste heat from the blast furnace
