Hinkley Point C: Unit 1 and Unit 2
KAEFER designed specialist access and climate controlled containment systems with our Scaffolding, Access and Rescue teams, which is also crucial...
Welcome to the KAEFER Group
KAEFER designed specialist access and climate controlled containment systems with our Scaffolding, Access and Rescue teams, which is also crucial...
KAEFER’s international approach to the Talara project delivered significant productivity improvements in PFP, thermal insulation and scaffolding. The commitment shown...
Tutuka is the Zulu word for progress. Since its completion in 1996, the Tutuka power station is feeding energy into...
Hinkley Point C is the first of a new generation of UK nuclear power stations and is the largest construction...
EDF’s Gravelines power station is located on the North Sea coast, at an equal distance from Dunkirk and Calais. It...
The new combined heat and power plant in Vilnius will be able to produce about 40% of the heat centrally...
Right before summer holidays in 2020, client Borealis got hit by a big fire on one of its sites. Luckily,...
The North Sea Martin Linge field is located 42 kilometres west of Oseberg. Equinor became the operator of the Martin...
One of the largest equipment ever delivered to the Port of Antwerp in one piece by ship for Borealis’ propane...
The large, plant-wide turnaround was executed despite of the pandemic. This caused for an adjusted execution in terms of Health...
The Crude Flexibility Project is an ongoing mega project in the United Arab Emirates. KAEFER’s activities are located in two...
This project represents the biggest scaffolding maintenance contract for KAEFER in Qatar to date. It is also the first LEAN...