Hinkley Point C: Unit 1 and Unit 2
KAEFER designed specialist access and climate controlled containment systems with our Scaffolding, Access and Rescue teams, which is also crucial...
Welcome to the KAEFER Group
KAEFER designed specialist access and climate controlled containment systems with our Scaffolding, Access and Rescue teams, which is also crucial...
KAEFER’s international approach to the Talara project delivered significant productivity improvements in PFP, thermal insulation and scaffolding. The commitment shown...
Hinkley Point C is the first of a new generation of UK nuclear power stations and is the largest construction...
The North Sea Martin Linge field is located 42 kilometres west of Oseberg. Equinor became the operator of the Martin...
Structural integrity remediation works for West Pilbara sites – Greater Paraburdoo, Brockman 2, Brockman 4, Tom Price.*total hours for 2020...
Structural steel and paint remediation services for the Mission River Bridge. *total hours for 2020
Major maintenance and upgrades including conveyor / elevator belt replacement, new chute installation, motorised valve refurbishment, installation of ceramic linings,...
Insulation: 11,280 m² Surface Protection: 16,800 m² Scaffolding Structure: 220,800 m³ Scaffolding Platform: 38,400 m² Scaffolding Suspended: 76,800 m² *total...
Passive Fire Protection – Fendolite (33.5 mm): 14,203 m² Passive Fire Protection – intumescent (12.2 mm): 1,993 m² Structural Painting...